iEnvi was engaged by a childcare centre development company to undertake soil sampling at a residential site prior to the construction of a new childcare centre in Morningside, Queensland. Development approval had already been received for the construction of the childcare centre, however, the company were seeking to confirm the soil on site was not
read moreiEnvi was engaged by a client to undertake a preliminary site investigation and soil sampling (PSI) at a property in Sydney, NSW for the purpose of obtaining development consent for utilising the property for housing. The property was previously used for residential purposes before becoming vacant land and the client wished to develop it for
read moreiEnvi was engaged by a client to undertake a preliminary site investigation and soil sampling (PSI) at a property in North Western Sydney, NSW for the purpose of obtaining development consent for utilising the property as a place of worship. The property was previously used for agricultural purposes and the client wished to develop it
read moreAn industrial development in Hastings was planned in an area of acid sulfate soil occurrence which required vigilance and attentive management. Acid sulfate soils are naturally occurring along Victoria’s coastal zone and if left undisturbed, are generally non-threatening. However, when exposed to air, acid sulfate soils produce sulfuric acid and soluble iron which can be
read moreFrom February to May 2019, iEnvi was engaged by an inner western Sydney Council in a resource recovery program to reuse road asphalt as engineering fill for the planned development of new sports fields and courts at a reserve. In New South Wales, resource recovery orders and resource recovery exemptions allow some wastes to
read moreiEnvi has undertaken soil vapour sampling, using the implementation of the ASC NEPM, to identify potential risks of vapour intrusion regarding human exposure on various sites. Vapour intrusion is vapor-forming chemicals migrating from a subsurface source into an overlying building as well as basement carparks, trenches/pipes and conduits. The requirement for vapour assessment as part
read moreiEnvi was engaged to complete an Operational Environmental Management Plan (OEMP) to be implemented and managed by an auto vehicle storage and container packing company to unload, store, modify and pack vehicles for the purpose of new auto vehicle storage and container packing for export business. The OEMP was prepared to document environmental controls that
read moreiEnvi were engaged by a client to complete a limited soil investigation for the purpose of pre-purchase due diligence at a property currently used as an open car parking facility, intended for redevelopment as a materials storage and a soil conveyor system. The purpose of this PSI and soil investigation was to assess if there
read moreA major coal mining client engaged iEnvironmental Australia to undertake asbestos monitoring in accordance with an existing Asbestos Management Plan, which required annual inspection of a single electrical control room asbestos sheeting. A local contractor we work with regularly was engaged and iEnvi specialists project managed and reviewed their report, to save on the
read moreiEnvi was engaged by a community group to undertake a preliminary site investigation and soil sampling (PSI) at a property in western Sydney) for the purpose of obtaining development consent for utilising the property as a place of worship. iEnvi has a 100% development approval record for our preliminary site investigations, and completed a
read more