Building Confidently on a Closed Landfill: Gas Risk Assessment and a practical CEMP

How a lean, risk‑focused contaminated‑land approach gave a community sports club a construction‑ready landfill gas assessment and a practical Construction Environmental Management Plan (CEMP) so the clubhouse could be built safely, on time and on budget.

Orchard Preliminary Site Investigation and Soil Sampling, Griffith NSW

iEnvi conducted a preliminary site investigation, soil sampling, and a geotechnical classification on an orchard to determine whether the site was suitable for a low density residential development. All requested tasks had to be completed quickly and to a high standard for the client to obtain financing.

iEnvi completed a rapid preliminary site investigation (PSI), soil sampling (60 samples) and geotechnical site classification for a 75‑lot low‑density residential proposal on former citrus orchard land in Griffith LGA. Soils met NSW Excavated Natural Material criteria and the site was classified as moderately reactive (20–40 mm movement potential).

South Australia: 2 x PSI on Agricultural Land for 70- and 50-Lot Residential Developments

iEnvi can conduct preliminary site investigations and soil sampling anywhere in Australia. Recently we undertook such work in South Australia, for a developer who required fast turnaround on preliminary site investigations and soil sampling for two potential housing developments.

iEnvi completed two fast-turnaround Preliminary Site Investigations (PSI) near Adelaide, SA. One site showed significant risk from past loam mining and fill and requires a larger investigation, remediation and auditor sign-off; the second was suitable for a 50‑lot subdivision after limited sampling.

Preliminary Site Investigation for Child Care Centre — Sydney Northern Beaches

Desktop (Phase 1) preliminary site investigation for a proposed child care centre in Sydney’s Northern Beaches. The desktop study identified low contamination potential from on‑site history but recommended targeted soil sampling and an asbestos hazardous‑materials inspection before council proceeds with a development application.

Townhouse Development Preliminary Site Investigation, Sebastopol (Vic)

Case study: PSI, combined geotechnical and environmental drilling, 30 soil bores to 5 m, 15 primary soil samples. Delivered reporting for planning permit in ~2 weeks; cost reported just over $10,000. Practical takeaways for developers on compliance, demolition hazards and cost efficiencies.