Building Confidently on a Closed Landfill: Gas Risk Assessment and a practical CEMP

How a lean, risk‑focused contaminated‑land approach gave a community sports club a construction‑ready landfill gas assessment and a practical Construction Environmental Management Plan (CEMP) so the clubhouse could be built safely, on time and on budget.

Baseline Environmental Condition Investigation – Western Melbourne Bus Depot

iEnvi completed a Baseline Environmental Condition Investigation (BECI) at an established western Melbourne bus depot to meet Department of Transport & Planning requirements. Targeted soil and groundwater testing (10 soil bores and monitoring wells) found no significant contamination; a Fuel System Operating Plan (FSOP) was recommended and reporting provided regulator‑defensible documentation under Victoria’s Environment Protection Act 2017.

Soil Investigation Clears Path for Safe Construction at Chemical Site, Victoria

iEnvi completed an asbestos- and contaminant-focused soil classification at an industrial chemical site in Melbourne, providing a compliant, cost-effective pathway for excavation and construction of a flammable goods storage area.

Compliance investigation and cost‑effective remediation of asbestos‑impacted soil — Coolaroo industrial site (VIC)

industrial site land

iEnvi investigated asbestos‑impacted soil and groundwater at an industrial site in Coolaroo (VIC). Bonded asbestos in stockpiled soil was removed by hand‑picking (emu‑picking) and the remaining material verified for reuse as clean fill, avoiding costly landfill disposal while meeting EPA Victoria obligations under the General Environmental Duty.