Proof in the Soil: PSI and Screening for a Former Sawmill

A concise, defensible Preliminary Site Investigation (PSI) and targeted soil screening at a former regional Queensland sawmill clarified contamination risk (timber-treatment residues, unknown fill, petroleum), updated the conceptual site model and set clear triggers for any further DSI or groundwater work — supporting sale, planning and due diligence.

Ensuring Safe School Development: Soil and Asbestos Investigations in Wollert

Proposed school site with stockpiles in distance

iEnvi conducted a Preliminary Site Investigation and soil testing across two lots (≈9.9 ha) in Wollert, Victoria. Eleven surface samples and stockpile checks found no asbestos or contaminant levels above NEPM Tier 1 screening criteria for sensitive land uses, supporting school development approval with a small set of practical recommendations for construction-phase controls.

Lease Renewal of Petrol Station: Baseline Environmental Investigation, Granville NSW

Baseline environmental investigation for lease renewal of a petrol station in Granville NSW. Two bores and two additional monitoring wells installed, groundwater and soil vapour assessed — low residual risk and no duty to report under NSW CLM Act Section 105.